BUILT TO ACCELERATE TIME TO FIRST ELECTRON.

Land, energy, utilities, permits and community alignment. One boundary, one counterparty, one date.

  • One boundary
  • One counterparty
  • One date

The powered plot

WE DELIVER A BUILD READY POWERED PLOT.

Meridian delivers the foundation-ready powered plot. Customers build and control everything above the foundation.

The build ready powered plot, in cross sectionAn isometric cross section of the powered plot. Five Meridian strata stack below the boundary: land, power, permits, water and fiber, and community. On the surface, power is delivered at the plot and dashed pads mark the customer's foundations. A wireframe building above the boundary carries shell, MEP, and racks and compute. A plaque reads foundation ready plot: Meridian below, the customer above.MERIDIAN SCOPELand control and entitlementsPower delivered to the plotWater, fiber, and cooling permitsCommunity consent and covenantsCUSTOMER SCOPERacks and computeMEP and coolingShell and structureSite operationsFoundations and slabsLANDPOWERPERMITSWATER · FIBERCOMMUNITYSHELLMEPRACKS · COMPUTEFOUNDATIONSPOWER AT THE PLOTFOUNDATION READY PLOTThe handoff. Meridian below.The customer above.

HOW TO READ THIS IMAGE

Read the strata from the ground up: community alignment, water and fiber, permits, power, and land, held by Meridian below the line.

On the surface, power arrives at the plot. Above the line sit the customer’s foundations, shell, MEP, and racks and compute, and the handoff is marked: foundation ready.

First power

TARGET: FASTEST TO FIRST ELECTRON.

On qualifying brownfield sites, Meridian revitalizes and reinvigorates past investments.

Conventional greenfield delivery runs >36 months.

Target: 12 to 18 months to first power, against conventional greenfield deliveryTwo horizontal bars on a shared time axis from zero to 60 months. The conventional greenfield bar runs the full axis: interconnection, permits, site work, construction, and community alignment, reaching first power in 36 to 60 months. The Meridian brownfield bar is much shorter: build on inherited interconnection and reach first power in 12 to 18 months, marked by a clay power-on point at the end of the bar.CONVENTIONAL GREENFIELDINTERCONNECTIONPERMITS>36 MOPOWERCOMMUNITYMERIDIAN BROWNFIELD<12 MOMO 0MO 60

The conventional path spends its first two years in queues: interconnection study, permitting, and community alignment, each on its own timeline and each a separate counterparty.

Meridian typically starts with brownfield sites where past investments are revitalized. The build begins inside a single accountable delivery path, and first power is available in a fraction of the time.